PROJECT TITLE:

Schuyler House Exterior Stairway

DESCRIPTION OF PROJECT:

A portion of the 1840 wood framed original Schuyler House building has deteriorated due to water infiltration at the connection of the northeastern exterior steel framed stairway.
1. Repair the exterior stairway and the deteriorated portion of wall which includes both steel and wood repairs, as well as foundation repairs.
2. Repair architectural finishes impacted by the deteriorated structure, consistent with existing finish and install two (2) new doors.
3. Replace electrical in-kind due to water infiltration.

ESTIMATED CONSTRUCTION BUDGET:

$220,000-$240,000

PRE-BID MEETING:

10/07/2021 at 10:00 AM
via Zoom Meeting and Room 133 in Humphreys Service Building

BID OPENING:

10/26/2021 at 2:00 PM
NA - (Electronic Bid - Results will be posted to this website)

PROJECT SCHEDULE:

Start:
Within ninety (90) days of written authorization to proceed.
Completion:
August 1, 2022

ARCHITECT/ENGINEER:

Quinn Olsen-Bieber     
Facilities Engineering, Cornell University     
201 Humphreys Service Building     
Ithaca, New York 14853     
Email: aco39@cornell.edu

INVITED BIDDERS:

Andrew R. Mancini Associates, Inc
F. E. Jones Construction, Inc.
Streeter Associates, Inc.
W.L. Kline Inc.
Welliver McGuire, Inc.
607-754-7070
607-348-0045
607-734-4151
607-724-6637
607-535-5400
607-786-0410
607-348-0050
607-732-2952
607-724-6650
607-535-9254

To obtain documents Click Here