PROJECT TITLE:
Demolition of Facilities at Hungerford Hill
DESCRIPTION OF PROJECT:
1. Demolition of the three (3) buildings listed below, along with follow-up site work addressing existing utility disconnects/re-routing and site grading/site finishing:
A. LAS D-Barn 1750
B. Newman Barn A 1752
C. Vibrio Barn G 1757
2. Alternate work consists of four (4) separate buildings to include pre-demolition abatement of all identified asbestos containing materials and the “clean” demolition of the single-story slab.
A. LAS D-Barn 1750
B. Newman Barn A 1752
C. Vibrio Barn G 1757
2. Alternate work consists of four (4) separate buildings to include pre-demolition abatement of all identified asbestos containing materials and the “clean” demolition of the single-story slab.
ESTIMATED CONSTRUCTION BUDGET:
$225,000-$350,000
PRE-BID MEETING:
11/07/2022 at 11:00 AM
102C Humphreys Service Building/Zoom Meeting with Walkthrough to Follow
BID OPENING:
12/01/2022 at 2:00 PM
133 Humphreys Service Building Bids opened via Zoom
ARCHITECT/ENGINEER:
Stephen Pruslipsky
Delta Engineers, Architects, & Land Surveyors
Delta Engineers, Architects, & Land Surveyors
INVITED BIDDERS:
BIDDING OPEN TO ALL CONTRACTORS
COST PER SET:
$49.00